An article called "Blount to Build Icebreaking Tug for NYPA" was featured on marinelink.com. Bristol Harbor Group, Inc., designed the tug and are providing construction oversight services to NYPA during the construction.
An article called "Blount to Build Icebreaking Tug for NYPA" was featured on marinelink.com. Bristol Harbor Group, Inc., designed the tug and are providing construction oversight services to NYPA during the construction.
Bristol, Rhode Island – August 27th, 2018 – Bristol Harbor Group, Inc. (BHGI) was recently contracted by Sayville Ferry Service, Inc. located in Sayville, NY to provide the design of an aluminum monohull high speed ferry for 400 passengers and cargo providing service from Sayville to Fire Island.
Bristol, Rhode Island – August 24, 2018 – Bristol Harbor Group, Inc. (BHGI) is pleased to announce that TOTE Maritime has taken delivery of a 232’, 2,200m3 liquified natural gas (LNG) bunker barge. CLEAN JACKSONVILLE is the first LNG bunker barge to be built in North America. BHGI was responsible for the design and engineering of the barge.
Bristol, Rhode Island – July 24th, 2018 – Bristol Harbor Group, Inc. (BHGI) would like to introduce Teri LaForest, BHGI’s most recent addition to its naval architecture and marine engineering practice. Teri has joined BHGI as a Naval Architect. She holds an M.S.E. in Naval Architecture and Marine Engineering from the University of Michigan (U of M), located in Ann Arbor, Michigan.
Bristol Harbor Group, Inc. (BHGI) would like to welcome its newest summer interns from the University of Michigan, John Kreuter and Alexa Wisniarek!
Bristol, Rhode Island – February 26th, 2017 – Bristol Harbor Group, Inc. (BHGI) is pleased to announce that the Vane Brothers Company has taken delivery of a BHGI designed 403’ x 74’ x 32’, 80,000 BBL double hull AT/B oil tank barge.
Bristol Harbor Group, Inc. (BHGI) would like to welcome our new winter intern, Daniel Roske. Daniel is currently a junior at Webb Institute in Glen Cove, NY.
Bristol, Rhode Island – October 4, 2017 – Bristol Harbor Group, Inc. (BHGI) would like to introduce John Hunter, P.E., BHGI’s most recent addition to its naval architecture and marine engineering practice. John has joined BHGI as a Senior Naval Architect.
Bristol, Rhode Island – August 28th, 2017 – Bristol Harbor Group, Inc. (BHGI) would like to introduce Ian Lawson, BHGI’s most recent addition to its naval architecture and marine engineering practice. Ian has joined BHGI as a Naval Architect.
Bristol, Rhode Island - July 24th, 2017 - A white paper called "Designing for Efficiency" by Greg Beers, P.E., President of Bristol Harbor Group, Inc. (BHGI) and The Shearer Group, Inc. (TSGI) was recently published in the White Paper digital issue of Maritime Reporter & Engineering News. You can read the white paper by clicking the link below!http://digitalmagazines.marinelink.com/NWM/MaritimeReporterWhitePapers/201707/
Bristol Harbor Group, Inc. is a full-service naval architecture and marine engineering firm specializing in commercial vessel design and consulting.
Bristol Harbor Group, Inc.
99 Poppasquash Road, Unit H
Bristol, RI 02809
Copyright 2018 © Bristol Harbor Group, Inc. | All Rights Reserved