An article featured in the October issue of WorkBoat on pages 50-54 called, Mission to Mars by Ken Hocke is an article definitely worth reading. The article is about the lengthening of the NASA barge PEGASUS in order to carry the core stage of NASA’s SLS. Bristol Harbor Group, Inc. worked with the U.S. Army Corps of Engineers, Marine Design Center to design the modifications for the Pegasus. Check it out!